Project Info

The school intended to have more space in the main room so that the dancers could perform diagonals and technical work, on the other hand, the existing circulation did not allow for a correct separation of public and private space.

Location

Loulé

Surface Area

75m2

Status

Completed work / Job Done

Project Description

In relation to the proposal, a new plasterboard wall was created, eliminating the previous corridor, thus making it possible to create a reception area to welcome students as well as create a changing room area before entering the new classroom now. with more width. The floor was changed so that it was a non-slip floor suitable for this purpose.